The project benefits from existing infrastructure, which includes:
- Major provincial Hwy 109 leads to and cuts across the Project
- Hydro-Powerline (Powerline 6) currently runs right through the Project
- Full-service 46-person camp in place just west of highway 109
- Core logging & storage facilities
- Rail & Air within 55km (Matagami)